(888) 764-9890
Serving West Virginia, Coverage

Home › Coverage › West Virginia

Backflow Testing in West Virginia

Backflow Testing across West Virginia: the 177 ZIP codes and 89 cities we route calls in, and who licenses plumbers in the state.

Call (888) 764-9890

Plumber's hands fitting pipe connectors together

Free to homeowners in West Virginia — the contractor pays us for the introduction, you never do.

Who has to test

Our backflow testing coverage in West Virginia runs to 177 ZIP codes in 89 cities. Where the covered places are many and small, the testing duty is set by whichever water utility serves the connection, so two houses a mile apart can sit under different rules and different annual deadlines.

Source: coverage area as published by our call partner; place and county names from the US Census Bureau.

We route backflow testing calls in 177 ZIP codes across 89 West Virginia cities, in 13 counties.

What this site is

CrossConnect is a referral service, not a contractor. We connect property owners and managers with independent contractors. Backflow assembly testing is normally restricted to testers holding a specific certification and using calibrated equipment, and the report usually has to reach your water purveyor — ask to see the certification and ask who files the report. We carry out no testing, we certify nobody, we do not set prices, and we never charge callers anything. Nothing here selects a device for any installation or states that any assembly is passing.

Checking a credential in West Virginia

West Virginia licenses are issued by the West Virginia Division of Labor, which publishes a public search you can use before work begins.

Every West Virginia county we cover

  • Berkeley County 11 ZIP codes
    Martinsburg, Bunker Hill, Falling Waters, Gerrardstown, Glengary, Hedgesville, Inwood
  • Boone County 3 ZIP codes
    Ashford, Nellis, Ridgeview
  • Cabell County 47 ZIP codes
    Huntington, Barboursville, Culloden, Glenwood, Lesage, Milton, Ona, Salt Rock
  • Hampshire County 6 ZIP codes
    Bloomery, Capon Springs, High View, Shanks, Slanesville, Yellow Spring
  • Jackson County 7 ZIP codes
    Advent, Cottageville, Evans, Gay, Given, Kenna, Ripley
  • Jefferson County 8 ZIP codes
    Charles Town, Harpers Ferry, Kearneysville, Millville, Ranson, Shenandoah Junction, Shepherdstown, Summit Point
  • Kanawha County 59 ZIP codes
    Charleston, South Charleston, Alum Creek, Dunbar, Elkview, Hernshaw, Institute, Nitro, Pinch, Pratt, Saint Albans, Tad, Tornado, Winifrede
  • Lincoln County 6 ZIP codes
    Griffithsville, Hamlin, Sod, Sumerco, West Hamlin, Yawkey
  • Mason County 7 ZIP codes
    Apple Grove, Ashton, Gallipolis Ferry, Leon, Mount Alto, Point Pleasant, Southside
  • Morgan County 1 ZIP code
    Berkeley Springs
  • Putnam County 11 ZIP codes
    Bancroft, Buffalo, Eleanor, Fraziers Bottom, Hometown, Hurricane, Liberty, Poca, Red House, Scott Depot, Winfield
  • Roane County 1 ZIP code
    Amma
  • Wayne County 3 ZIP codes
    Ceredo, Kenova, Lavalette

What that coverage looks like

The 13 counties in our West Virginia footprint are served by many separate water suppliers, and each one decides which premises must test and how often. Kanawha County, with 59 covered ZIP codes, is the largest single block of them; Charleston alone holds 45.

How a backflow testing job goes

A backflow test is a scheduled job that ends in a document. The assembly is isolated, the differential across it is measured, the result is written down, and the report goes to whoever requires it. A failed test means a repair or a rebuild and then a re-test; it does not mean the premises closes that day.

What the call asks about backflow testing

  • What kind of premises it is and what is connected to the supply — irrigation, a boiler, a fire line, a commercial kitchen.
  • Who is asking for the test: a water supplier, a health department, or a landlord.
  • Whether there is an existing assembly with a serial number on it, and when it was last tested.

Every West Virginia city we route in

13 cities, ordered by the share of buildings with twenty or more units. Containment assemblies are required building by building, and that is where the buildings are. Each page carries that city’s own numbers and the ZIP codes we route there.

Before you call

A test is a scheduled job with a report at the end of it, not a repair. What the report has to show, and who it goes to, are on the pages above.

Steel pipework with a pressure gauge on the line
Pipes being installed with hand tools
Call (888) 764-9890